Onyx Projects is proud to announce that it has successfully delivered the detailed design of a second overhead crane installation inside an existing car dumper facility at Port Hedland. This marks the fourth successful project delivery of a similar nature.
The scope of work was completed by an experienced multi-discipline engineering and design team who were focussed on delivering a design solution that minimised the impact to port operations during installation.
The design consisted of 3D animations to assist in the visualisation of the installation methodology, crane rail support structural verification and modification to the power supply for both the existing crane and new crane.