Following on from our successful delivery of the previous phase, Rio Tinto has requested Onyx Projects complete the Feasibility Study and Detail Design for the CLAHDO project. The Cape Lambert A facility requires significant upgrade to accept a more diverse product. The design requirements include modifications to mechanical equipment and associated structural and electrical changes from Car Dumper 2 through to the shiploaders and wharf infrastructure. It also includes redesign of the sampling facility incorporating a new automated sample preparation facility.