Onyx Projects was initially engaged by W2WA to manage the completion of the engineering design for both the Beenyup and Woodman Point projects. Engineering personnel were also seconded by Onyx Projects into key positions within the engineering and commissioning teams at both sites. The scope of work of the Beenyup upgrade involved increasing the ...
Infrastructure
West Angelas Village Expansion
Engineering, procurement and construction management of additional rooms and facilities at West Angelas Village. The works include: Demolition of an existing Kitchen144 construction rooms3 Laundry buildings; and3 Ablutions / Shower buildings Relocation of a linen facilitya computer training rooma chemical storeice roomsan annex ...
West Angelas Access Road
The West Angelas Access Road Project comprises upgrade works to Main Access Road from the Great Northern Highway to the West Angelas mine site, the West Angelas accommodation village, and the local Airport, totalling approximately 32 km in length. The Works include: Alignment improvements, both horizontally and vertically, to generally meet a ...
Hope Downs 1 Mine Dewatering
The existing Hope Downs 1 Mine Dewatering System was inadequate to achieve the mine plan abstraction rate of 110ML/day. Onyx Projects (OP) was commissioned initially to carry out a scoping study to determine the dewatering requirements forĀ North East, North West and South Central Pits to achieve the mine plan peak target of 110ML/day. OP were ...